Start With The Right Information

Give your project a clear starting point.

You do not need a finished specification to begin. Share what is known, identify what is still open, and use this checklist to guide the first engineering conversation.

01 / Planning guide

Process and electrical requirements

Equipment and operation

Provide the equipment list, motor nameplate data, operating sequence, required modes and interlocks. Include existing drawings or a process description where available.

Power and field connections

State incoming voltage, phase, frequency and known fault-current data. Identify motor runs, instrumentation, grounding and the contractors responsible for external connections.

Automation and information

List I/O, preferred Allen-Bradley platforms, operator interfaces and communication requirements. Describe alarms, data needs, remote supervision and any existing systems to integrate.

02 / Planning guide

Container and project requirements

01

Site and environment

Share the location, ambient conditions, elevation, environmental exposures and any area classification. Include space limits, service access and requirements for future relocation.

02

Availability and acceptance

Define expected operating hours, redundancy needs and the response to utility loss. Identify required approvals, documentation, shop checks and functional acceptance tests.

03

Schedule and responsibilities

Give the target operating date and key site milestones. Assign supply, transport, offloading, installation and commissioning responsibilities, including any equipment furnished by your team.

Put the plan to work.

Keep a copy for your project review, then share the details with our team.

A few useful answers.

What is enough information for an initial discussion?

A process description, preliminary equipment list, installation location and target date provide a useful start. Existing drawings, motor schedules and photographs add context.

Should we choose the container size first?

Begin with equipment, electrical working space, service access and thermal requirements. The 20 ft interactive model is a reference; the final footprint follows your engineered layout.

Your process. Your location. Your next move.

Let’s put your control system
in a place that can go places.

Discuss Your Project